A new Fairfield by Marriott costs $12.3M to $27.2M for 80-110 rooms before land per the 2026 FDD, $154K to $247K per key. SBA S0620, lenders and sizing.

In this article
- Key takeaways
- What does it cost to build a Fairfield?
- What are the Fairfield franchise fees?
- How does a Fairfield perform?
- Is Fairfield SBA eligible?
- Who finances a Fairfield build?
- How do lenders size a Fairfield construction loan?
- Worked example: a 96-room Fairfield new build
- When is a Fairfield build the wrong tool?
- Frequently asked questions
A new Fairfield by Marriott costs $12,289,300 to $27,222,300 for an 80- to 110-room hotel and $16,984,400 to $34,537,000 for 120 to 150 rooms, excluding land, permit and impact fees, insurance and contingency, according to Marriott's franchise disclosure document dated March 31, 2026. That is about $154,000 to $247,000 per key on the smaller prototype. Fairfield is SBA eligible, listed on the SBA Franchise Directory as code S0620. Owners finance a build with a construction loan at 55% to 75% of cost from Bridge, a bank or a hotel debt fund, a C-PACE layer on the mechanical scope, and 25% to 35% equity. An owner-operator under about $15 million of cost can use SBA 504 at 15% to 20% equity.
The number that sizes the loan is not the cost but the NOI. Fairfield's 2025 system performance in the same FDD was a $135.01 ADR, 67.7% occupancy and $91.44 RevPAR, a 107.4 RevPAR index; on a 96-room build at $200,000 per key all-in that NOI supports about $9.8 million of senior debt, 51% of cost, so the equity on a Fairfield runs higher than its cost per key suggests. This guide gives the Item 7 line items, the fees, the prototype, the SBA facts, the lenders, the sizing math and a worked stack. Bridge lends directly on construction from $10 million to $50 million; the program is on its hotel financing page.
Key takeaways
- 2026 FDD: $12.3M to $27.2M for 80-110 rooms before land, $154K to $247K per key; 120-150 rooms $17.0M to $34.5M.
- Fees: $75,000 application, 5.5% franchise fee, 3.85% program services, 1.55% loyalty, 20-year term.
- 2025 performance: $135.01 ADR, 67.7% occupancy, $91.44 RevPAR, RevPAR index 107.4.
- SBA eligible: Franchise Directory code S0620; 7(a) to $5M, 504 at 15-20% equity, $10M combined.
- At the brand's 2025 average NOI a 96-room Fairfield supports about 50% to 55% senior leverage; the site has to out-earn the system.
What does it cost to build a Fairfield?
From the Fairfield by Marriott 2026 FDD, Item 7, which puts a typical new suburban hotel of 80 to 110 rooms at $12,289,300 to $27,222,300 and 120 to 150 rooms at $16,984,400 to $34,537,000 before land, and reports a $135.01 ADR, 67.7% occupancy and $91.44 RevPAR for 2025. The table excludes real estate, building permit, tap and impact fees, insurance and contingency. Per-room lines multiply by the room count, and the FDD totals carry further lines not shown here.
Item 7 line (80 to 110 rooms) | Low | High |
|---|---|---|
Application fee | $75,000 | $75,000 |
Building construction | $121,200 per room | $201,900 per room |
Furniture, fixtures and equipment | $13,000 per room | $17,800 per room |
Paid to Marriott and affiliates (fees, design review, technology) | $197,000 | $283,500 |
FDD total, 80 to 110 rooms | $12,289,300 | $27,222,300 |
Per key | about $154,000 (80 rooms, low) | about $247,000 (110 rooms, high) |
FDD total, 120 to 150 rooms | $16,984,400 | $34,537,000 |
Per key | about $142,000 | about $230,000 |
The 2025 FDD put the same hotel at $12,021,800 to $26,659,200, so the 2026 budget rose about 2%, well under the 15% jump in Hilton's Home2 and below HVS's 4.8% trailing construction-cost increase. Add the land: the 80- to 110-room prototype is 37,000 to 61,000 square feet on about 1.85 acres, and the 120- to 150-room prototype 55,000 to 84,000 square feet on about 2.1 acres, which in a suburban market is $1 million to $2.5 million. Add 10% to 15% contingency and an interest reserve of 4% to 6% of the loan, both excluded from the table, and most Fairfield builds land at $190,000 to $280,000 per key all-in.
What are the Fairfield franchise fees?
The 2026 FDD sets a franchise fee of 5.5% of gross room sales, a program services contribution of 3.85% and a loyalty charge of 1.55%, on top of the application fee.
Fee | Rate (2026 FDD) |
|---|---|
Application fee | $75,000 plus $400 per room over 125 |
Franchise fee (royalty) | 5.5% of gross room sales |
Program services contribution | 3.85% of gross room sales (includes the 2.5% marketing fund) plus $7,000 a year and $135 per room per year |
Loyalty charge | 1.55% of qualifying revenue (1.45% through December 2027) plus 1% of qualifying event revenue, capped at $300 per event |
Term | 20 years from opening authorization, not renewable |
A Fairfield and TownePlace dual-brand signed by March 30, 2027 pays one $100,000 application fee plus $400 per room over 140. On a 100-room hotel at the system RevPAR the total recurring fee load is about 10.9% of room sales; the full schedule across Marriott's brands is in Marriott franchise fees by brand.
How does a Fairfield perform?
Item 19 of the 2026 FDD reports 2025 results for the STR-included Fairfield hotels: a $135.01 ADR, 67.7% occupancy, $91.44 RevPAR and a 107.4 RevPAR index. Marriott's second-quarter 2026 release put U.S. and Canada Fairfield systemwide RevPAR at about $105, up about 3.9%, on 1,205 hotels and 114,262 rooms, with 1,403 hotels worldwide. A single quarter is not a full year, however: the second quarter is seasonally strong for the brand, so $105 is the ceiling of a pro forma, not a like-for-like comparison with Item 19's full-year $91.44. New-build Fairfields range from 83 to 141 rooms with about 25% suites, and Marriott no longer franchises new-build Fairfield Inn or Fairfield Inn & Suites under the old names; the brand has been Fairfield by Marriott since 2018. For a lender, $91.44 is the floor of the pro forma and $105 the ceiling without a market study that justifies more.
Is Fairfield SBA eligible?
Yes. Fairfield by Marriott, including the Inn and Inn & Suites marks, is listed on the SBA Franchise Directory effective October 28, 2026 as code S0620, with the standard hotel condition that any third-party manager be unaffiliated with Marriott. The 2026 rules that apply:
- A 7(a) loan up to $5 million at a variable rate capped at 10.00%, which is prime plus 3.00 points with prime at 7.00%.
- A 504 with a 6.97% fixed 25-year debenture and 15% equity because a hotel is special-purpose property, or 20% if the business is also new.
- The two combinable to $10 million since July 4, 2026.
- Every owner a U.S. citizen or national since March 1, 2026.
- A 1.15x historical coverage test on the 504, which on a new build means the interim construction lender funds the build and the debenture takes it out.
The 20-year Marriott term against a 25-year SBA amortization is documented in the credit memo. The brand table and rules are in the SBA Franchise Directory check for hotel brands.
Who finances a Fairfield build?
Rank | Lender | Loan-to-cost | Pricing (Oct 2026) | Fit |
|---|---|---|---|---|
1 | Bridge (direct construction lending) | Up to 75% | Senior pricing from Bridge's own capital | $10M to $50M; closed a $15.5M Tru and a $22M Home2; arranges bank, SBA and C-PACE pieces below $10M |
2 | Banks and bank hotel desks | 55-65% | 6.25% to 7.25% | Sponsors with a prior hotel and a relationship |
3 | Hotel debt funds | 70-75% | SOFR + 350-600 (7.5% to 10%+) | Speed and leverage |
4 | SBA 504 (owner-operators) | 80-85% combined | 6.97% fixed debenture; bank first about 7% | Projects under about $15M |
5 | C-PACE layer | 12-25% of cost | High 6s to mid 7s fixed, 20-30 years | Any of the above with senior consent |
Market terms are from the Crittenden 2026 hotel lending survey: banks at 65% around 6.75% with coverage from 1.25x, debt funds at 70% near 10%. Bridge closed more than $500 million of hotel loans in 2025 and lends on construction from its own balance sheet.
How do lenders size a Fairfield construction loan?
Off the stabilized NOI. A 96-room Fairfield at the 2025 system RevPAR of $91.44 books about $3.2 million of room sales and $3.35 million in total; after the fee load of about 10.9%, a 4% FF&E reserve and operating costs, NOI at a 35% margin is about $1.17 million.
Test | 2026 target | Loan supported |
|---|---|---|
Debt yield | 12% | $9.75M |
Stabilized DSCR at a 7% perm rate, 25-year amortization | 1.30x | $10.6M |
Loan-to-cost on a $19.2M project | 65% | $12.5M |
Binding constraint | debt yield | about $9.8M, 51% of cost |
At $105 of RevPAR (the brand's Q2 2026 systemwide figure), NOI rises to about $1.5 million and the loan to $12.5 million, 65% of cost. That gap, $2.7 million of debt on a $14 swing in RevPAR, is why Fairfield developers underwrite the market study harder than the budget. The full requirements and draw mechanics are in hotel construction loans in 2026.
Worked example: a 96-room Fairfield new build
Building cost $17.5 million ($182,000 per key, inside the 80- to 110-room range), land $1.7 million, $19.2 million all-in, $200,000 per key. The market study supports $100 of RevPAR for this hotel, NOI about $1.4 million at a 38% margin.
Layer | Amount | Share | Terms (October 2026) |
|---|---|---|---|
Construction loan (Bridge direct or bank) | $11.7M | 61% | SOFR 3.92% + 300 (about 6.9%); 24 to 36 months; perm at 7% |
C-PACE assessment | $2.3M | 12% | 7.25% fixed, 25 years |
Equity (including land) | $5.2M | 27% | n/a |
Permanent debt service of about $992,000 on the senior loan and $205,000 on the assessment gives 1.17x on the combined stack at $1.4 million of NOI, which is why the senior lender will hold the loan near $11 million for 1.25x combined, pushing equity to $5.9 million. For an owner-operator, the SBA 504 route on the same project fails the $5.5 million debenture cap (35% of $19.2 million is $6.7 million), so the 504 fits a smaller Fairfield of 80 rooms at the low end of Item 7, about $14 million all-in. Fairfield key money is rare: Marriott's contract acquisition costs were $434 million in 2025 but per-deal amounts on select brands remain below 2019 levels.
When is a Fairfield build the wrong tool?
- Avoid it on a site under about $95 of RevPAR. At $200,000 per key the senior loan is half the cost at the brand average.
- Avoid the 120- to 150-room prototype without a market study that supports it. The larger building saves $12,000 per key but needs a quarter more demand.
- Avoid SBA 504 above about $15 million. The debenture cap binds.
- Avoid budgeting from the 2025 FDD or without the excluded items. Permits, impact fees, insurance, contingency and the interest reserve add 15% to 20%.
- Avoid a TownePlace dual-brand after March 30, 2027 expecting the single fee. The incentive is dated.
Frequently asked questions
How much does it cost to build a Fairfield Inn?
Marriott's March 31, 2026 FDD estimates $12,289,300 to $27,222,300 for an 80- to 110-room Fairfield and $16,984,400 to $34,537,000 for 120 to 150 rooms, excluding land, permit and impact fees, insurance and contingency, or about $154,000 to $247,000 per key on the smaller prototype. All-in with land most projects run $190,000 to $280,000 per key.
Is Fairfield Inn SBA eligible?
Yes. Fairfield by Marriott is on the SBA Franchise Directory as code S0620 as of October 28, 2026. Owners can use a 7(a) loan up to $5 million or a 504 with 15% to 20% equity, combinable to $10 million, provided every owner is a U.S. citizen or national under the 2026 rules and any third-party manager is unaffiliated with Marriott.
How do owners finance a Fairfield new build?
With a construction loan at 51% to 65% of cost (sized on stabilized NOI) from Bridge, a bank or a hotel debt fund, a C-PACE assessment on 12% to 25% of cost, and 27% to 40% equity; smaller Fairfields under about $15 million can use SBA 504. Bridge lends directly on construction from $10 million to $50 million.
What are the Fairfield franchise fees?
A $75,000 application fee (plus $400 per room over 125), a 5.5% franchise fee, a 3.85% program services contribution that includes the 2.5% marketing fund plus $7,000 a year and $135 per room per year, and a 1.55% loyalty charge, on a 20-year non-renewable term. Total recurring fees run about 10.9% of room sales.
What RevPAR does a Fairfield need to pencil?
About $100 of RevPAR on a $200,000-per-key build, the level at which a 61% construction loan covers 1.25x with a C-PACE layer in the worked example above. At Fairfield's 2025 average of $91.44 the senior loan drops to about half of cost; at the brand's Q2 2026 systemwide RevPAR of about $105 it reaches 65%.
Filed under
More from Hotel Financing
What the 2026 SBA Changes Mean for Hotel Owners
Hotel owners received two different messages from the Small Business Administration this fall.
Hotel FinancingBridge vs a traditional hotel mortgage broker
How Bridge compares to a traditional hotel mortgage broker on fees, speed and lender access. 50 bps vs the usual 1%, with a worked example.
Hotel FinancingMicrotel by Wyndham New-Build Financing in 2026: Moda Prototype Cost, Fees, Lenders and What They Need to See
A new Microtel Moda runs about $7.5M to $9.6M before land per a 2026 FDD summary, on a $40,000 fee and 6% royalty. Why SBA 504 fits, and the lenders.
Hotel FinancingLa Quinta New-Construction Prototype Cost in 2026, Is It on the SBA Franchise Directory, and How Owners Finance It
A new La Quinta Del Sol runs about $12.8M to $17.2M before land, on a $55,000 fee and 5.5% to 6% royalty. SBA code S0982 and who lends on it.