Hotel Financing
Best Western: What It Costs to Build or Buy, Whether It Is SBA Approved, and How Owners Finance It in 2026
A 75-room Best Western runs about $6.1M to $12.7M to build before land, on a $49,000 application and 5% royalty. SBA code S2125, how owners buy and build.

In this article
- Key takeaways
- How does Best Western’s membership model work, and what does it cost?
- What does it cost to build a Best Western?
- How big is Best Western, and how do its hotels perform?
- Is Best Western SBA approved?
- Who finances a Best Western?
- How do owners finance buying an existing Best Western?
- Worked example 1: buying an 80-room Best Western for $4.5 million
- Worked example 2: building a 75-room Best Western for $10 million
- When is Best Western the wrong frame?
- Frequently asked questions
Best Western is a membership association rather than a conventional franchisor, and that changes the financing in two ways. First, the fees: an application fee of $49,000, a 5% monthly royalty on room revenue and a 2.1% marketing and technology assessment across the core brands, plus annual dues scaled by room count, on a 20-year term. SureStay pays $37,500, 4% and 4%. Second, the brand publishes no financial performance representation, so lenders size a Best Western on the hotel's own trailing numbers and the comp set. A new 75-room Best Western is summarized at about $6.1 million to $12.7 million before land in the 2026 franchise disclosure document, with the Premier, Vib and Aiden brands ranging up to about $32.5 million. The document is provided through Best Western's development team, so confirm those figures against it.
Best Western is SBA approved, listed on the SBA Franchise Directory as code S2125 under a single membership agreement covering Best Western, Plus, Premier, Executive Residency, GLo and Aiden, with SureStay at S2322. The brand's hotels are a staple of SBA lending, with 77 SBA loans on Best Westerns since fiscal 2020 at a median of about $4.28 million. That is the practical answer to how owners buy an existing Best Western: an SBA 7(a) at 90% of cost under $5 million, or a 504 for the real estate, with a bank or debt fund loan above that. The acquisition example below puts a $4.725 million 7(a) on a $5.25 million purchase at 1.17x on trailing NOI, and the build example shows where a 75-room new build at $10 million lands.
Key takeaways
- Fees: $49,000 application, 5% royalty, 2.1% marketing and technology, plus annual dues; SureStay $37,500, 4% and 4%.
- New build about $6.1M to $12.7M for 75 rooms before land (third-party summary); Premier, Vib and Aiden to $32.5M.
- No Item 19: lenders size on the hotel's trailing-12 and the comp set, not a brand average.
- SBA approved: code S2125 (membership agreement) and S2322 (SureStay); 77 SBA loans since FY2020 at a $4.28M median.
- 1,659 Best Western and 1,136 Best Western Plus hotels; the brand added more than 200 hotels in 2025.
How does Best Western's membership model work, and what does it cost?
Best Western Hotels & Resorts is owned by its member hotels, so a new hotel joins rather than franchises: an evaluation fee, an entrance or affiliation fee, annual dues and a monthly assessment on room revenue replace the royalty-and-marketing-fund structure of a Hilton or Marriott, but the economics line up with them. The schedule below is from the Lodging 2026 Guide to Franchising, reflecting figures as of March 31, 2026, with the FDD detail from a third-party summary of the 2025 document.
Brand | Application / affiliation fee | Monthly royalty | Marketing and technology | Other | Term |
|---|---|---|---|---|---|
Best Western, Plus, Premier, Executive Residency, Aiden, Vib, GLo | $49,000 application (FDD: $4,000 evaluation + $45,000 affiliation for up to 50 rooms + $200 per room above 50) | 5% of room revenue (3.5% on some legacy agreements) | 2.1% of room revenue | Annual dues scaled by room count; advertising assessment about $16.39 per room per month; optional $4,000 impact study, creditable | 20 years |
SureStay, SureStay Plus, SureStay Studio | $37,500 | 4% | 4% (sales and marketing) | Annual dues | 20 years |
Two things the schedule hides. The dues are real money: on a 100-room hotel the fixed charges run into the tens of thousands a year on top of the 7.1% of room revenue, so model 8% to 8.5% all-in. And Best Western negotiates: the 2025 and 2026 FDDs both show the 5% standard, and the brand added more than 200 hotels in 2025, with 36 Aiden hotels open and more than 50 in the pipeline, which is the kind of growth that comes with fee concessions on conversions.
What does it cost to build a Best Western?
Item | Figure | Source quality |
|---|---|---|
Item 7 new construction, 75-room Best Western | $6,126,015 to $12,652,545 (2025 FDD); 2026 FDD $6,130,275 to $12,658,075 "presented by format" | Third-party summary |
Per key | about $82,000 to $169,000 | Computed |
Conversion to Best Western | $577,215 to $2,551,545 | Third-party summary of the 2025 FDD |
Premier, Vib and Aiden new builds | up to $32,493,745 | Third-party summary |
Vib example | HOTELS Magazine, 2022 | |
Financial performance representation | None in the 2025 or 2026 FDD | Third-party summary |
The core Best Western range sits under HVS's 2026 median of $170,000 to $197,000 for limited-service hotels because the membership model tolerates a wider range of building types than a prototype brand. The $82,000 low end is the obvious number to budget from, but it is the wrong basis for anything beyond a two-story, exterior-corridor building on cheap land; the Vib and GLo prototypes are the exceptions, built to a fixed design at $150,000 to $175,000 per key. Add land, contingency and an interest reserve, and a core-brand new build lands at $100,000 to $190,000 per key all-in.
How big is Best Western, and how do its hotels perform?
Worldwide, the Lodging 2026 guide counts 1,659 Best Western hotels with 121,774 rooms, 1,136 Best Western Plus with 103,030 rooms, 117 Premier, 391 SureStay, 36 Aiden, 12 GLo, 10 Executive Residency and 4 Vib. In the U.S., the 2026 FDD's Item 20 shows 1,750 member hotels with 32 openings and 52 closures in the year. The brand reports about 336,000 rooms across more than 3,900 hotels worldwide. There is no Item 19, so there is no published RevPAR, and a lender will want the specific hotel's STR report. Best Western's one owner financing program is DEX 3.0, an FF&E finance program through its supply arm announced at the 2024 convention; the brand publishes no key money program.
Is Best Western SBA approved?
Yes. The SBA Franchise Directory effective October 15, 2026 lists the Best Western membership agreement, covering Best Western, Best Western Plus, Premier, Executive Residency, @Home, GLo and Aiden, as code S2125, listed since October 2017, and SureStay and SureStay Studio as S2322, with the SureStay Collection distribution agreement added April 30, 2026 as S8758. Both carry the hotel manager-affiliation condition and, unusually for a transient brand, the extended-stay transient test (more than 50% of revenue from stays of 30 days or less), which a Best Western meets easily. Loan-level data compiled from SBA's public 7(a) and 504 FOIA releases shows 77 SBA loans on Best Western hotels since fiscal 2020 at a median of about $4.28 million, which is to say the brand is among the most common flags in hotel 7(a) lending.
The 2026 rules in four lines. A 7(a) runs to $5 million at a variable rate capped at 10.00%, which is prime plus 3.00 points. A 504 carries a 6.97% fixed 25-year debenture capped at $5.5 million and 15% equity on a hotel (20% if the business is also new), combinable with a 7(a) to $10 million since July 4, 2026. Every owner must be a U.S. citizen or national since March 1, 2026. An initial acquisition carries a 1.25x coverage test. The brand table and rules are in the SBA Franchise Directory check for hotel brands.
Who finances a Best Western?
Rank | Lender | Use | Leverage | Pricing (Oct 2026) | Fit |
|---|---|---|---|---|---|
1 | Bridge (direct construction above $10M; structures SBA, bank, USDA and debt fund loans) | Build, buy or refinance | Up to 75% | Senior pricing from the chosen lender; 0.50% fee on $10M+ acquisitions and refinances | Structures the stack and runs the process through closing; closed a $2.8M Baymont acquisition |
2 | Hotel-volume SBA 7(a) lenders | Acquisitions and conversions under $5M | Up to 90% | Variable, 9.25% to 10.00% cap | The most common Best Western loan |
3 | SBA 504 lenders and CDCs | Real estate on a build or purchase | 85% combined | 6.97% fixed debenture; bank first about 7% | Projects under about $15.7M |
4 | USDA B&I banks | Builds and purchases in towns under 50,000 | 80-85% guaranteed | About prime + 1 to 2 | A large share of the brand's footprint |
5 | Regional and community banks | Stabilized hotels with a relationship | 55-65% | 6.25% to 7.5% | Prior hotel required |
6 | Hotel debt funds | Acquisitions with a PIP above $5M | 65-75% | SOFR + 350-600 (7.5% to 10%) | Speed; no citizenship test |
Bank hotel franchise-finance desks and CMBS conduits are mostly absent: the desks lend on the four major flag families, and conduits price a membership brand without an Item 19 cautiously. Bridge closed more than $500 million of hotel loans in 2025, and on acquisitions and refinances of $10 million or more it structures the loan and runs the process through closing for a 0.50% fee.
How do owners finance buying an existing Best Western?
Most often with SBA 7(a), because the typical deal is $2 million to $6 million. A buyer who will operate the hotel borrows up to 90% of cost, including the purchase, the change-of-ownership PIP and working capital, at a variable rate capped at 10.00%, with 10% cash equity (a seller note on full standby can supply half) and 1.25x coverage on trailing NOI; above $5 million the real estate moves to a 504 and the PIP to a 7(a). Investors, non-citizen partners and buyers who will not operate use a bank at 55% to 65% or a debt fund at 65% to 75%. What every lender wants is the seller's trailing-12 USALI statement and STR report, because there is no brand average to lean on; how a specialist normalizes seasonal Best Western cash flow is in lenders who understand hospitality cash flow cycles.
Worked example 1: buying an 80-room Best Western for $4.5 million
Purchase $4.5 million, change-of-ownership PIP $600,000, closing and working capital $150,000: $5.25 million. Trailing NOI $590,000.
Line | Amount | Terms |
|---|---|---|
SBA 7(a) loan (90%) | $4.725M | Prime 7.00% + 2.75 = 9.75%, 25-year amortization |
Equity (10%) | $525K | $262K cash plus a $263K seller note on full standby |
Annual debt service | about $505,000 | $4.725M at 9.75% over 25 years |
Coverage on $590K of trailing NOI | 1.17x | Allowed on an acquisition the real estate fully secures, with 1.25x reached within two years at $630K of NOI |
The Best Western code (S2125) goes in the loan system, the executed membership agreement and PIP addendum go in the file before funding, and the buyer's management plan clears the experience factor. Closing runs 60 to 90 days.
Worked example 2: building a 75-room Best Western for $10 million
Building cost $8.8 million (upper-middle of the summarized range), land $1.2 million, $10 million all-in, $133,000 per key, in a market supporting $72 of RevPAR (NOI about $750,000).
Layer | SBA 504 (owner-operator) | Conventional (investor) |
|---|---|---|
Bank first mortgage / construction loan | $5.0M (50%) at about 7.0%; bank funds the build | $6.3M (63%) at SOFR 3.92% + 300, perm at 7% |
SBA 504 debenture at completion | $3.5M (35%) at 6.97% fixed | none |
C-PACE | none | $1.2M (12%) at 7.25% fixed, 25 years |
Equity (including land) | $1.5M (15%) | $2.5M (25%) |
Permanent debt service | about $720,000 | about $640,000 |
Coverage on $750K of NOI | 1.04x in year one; 1.15x at $830K after ramp | 1.17x |
The conventional stack works at $72 of RevPAR, the 504 stack clears 1.15x only after ramp, and neither works at $60, which is the Best Western underwriting in one line: the membership model keeps the cost per key low, and the loan follows the hotel's own numbers.
When is Best Western the wrong frame?
- Avoid assuming a brand-average RevPAR. There is none; the lender uses your hotel's trailing-12 and the comp set.
- Avoid modeling the 5% royalty plus 2.1% assessment as the total fee load. Annual dues and the per-room assessments push it to 8% to 8.5%.
- Avoid budgeting a Premier, Vib or Aiden from the core-brand Item 7. Those prototypes run to about $32.5 million.
- Avoid SBA if any owner is a lawful permanent resident or the hotel will be managed with full discretion by a third party.
- Avoid a CMBS refinance under about $8 million of loan. Conduits price a membership brand without an Item 19 cautiously and the fixed costs bite.
Frequently asked questions
Is Best Western SBA approved?
Yes. The Best Western membership agreement covering Best Western, Plus, Premier, Executive Residency, GLo and Aiden is on the SBA Franchise Directory as code S2125, listed since October 2017; SureStay is S2322 and the SureStay Collection S8758. SBA's public loan data shows 77 SBA loans on Best Westerns since fiscal 2020 at a median of about $4.28 million.
How much does it cost to build a Best Western?
About $6.1 million to $12.7 million for a 75-room Best Western before land, or $82,000 to $169,000 per key, per third-party summaries of the 2025 and 2026 FDDs; the Premier, Vib and Aiden prototypes range up to about $32.5 million. A Vib ran about $175,000 per key in one published project. Best Western provides the FDD through its development team.
What are the Best Western franchise fees?
A $49,000 application fee, a 5% monthly royalty on room revenue and a 2.1% marketing and technology assessment on the core brands, plus annual dues scaled by room count, on a 20-year term; SureStay pays $37,500, 4% and 4%. The FDD breaks the application fee into a $4,000 evaluation fee and a $45,000 affiliation fee for up to 50 rooms plus $200 per room above 50.
How do owners finance buying an existing Best Western?
Most often with an SBA 7(a) loan at up to 90% of cost for an owner-operator buying under $5 million of debt, with 10% equity and 1.25x coverage reached within two years; a 504 takes the real estate above that. Investors and non-citizens use a bank at 55% to 65% or a debt fund at 65% to 75%. Bridge structures all of these and ran a $2.8 million Baymont acquisition through closing.
Does Best Western publish performance data?
No. Neither the 2025 nor the 2026 FDD contains an Item 19, so lenders underwrite each Best Western on its own trailing-12 USALI statement and STR report. A brand-wide occupancy figure, where one is quoted, is not something a lender will size a loan on.
Filed under
More from Hotel Financing
Microtel by Wyndham New-Build Financing in 2026: Moda Prototype Cost, Fees, Lenders and What They Need to See
A new Microtel Moda runs about $7.5M to $9.6M before land per a 2026 FDD summary, on a $40,000 fee and 6% royalty. Why SBA 504 fits, and the lenders.
Hotel FinancingLa Quinta New-Construction Prototype Cost in 2026, Is It on the SBA Franchise Directory, and How Owners Finance It
A new La Quinta Del Sol runs about $12.8M to $17.2M before land, on a $55,000 fee and 5.5% to 6% royalty. SBA code S0982 and who lends on it.
Hotel FinancingHomeTowne Studios by Red Roof: Economy Extended-Stay Financing in 2026 and What Lenders Need to See
HomeTowne Studios by Red Roof in 2026: about $11.7M to $14.5M to build or convert, $30,000 fee, 5.5% royalty, SBA code S6329, and who lends on it.
Hotel FinancingMarriott Franchise Fees by Brand in 2026: Fairfield, TownePlace, SpringHill, Courtyard, Residence Inn, StudioRes and City Express, With SBA Eligibility and What Lenders Need
Marriott franchise fees by brand from March 31, 2026 FDDs: $75,000 to $90,000 application, 5.5% to 6% royalty plus program services, 9% to 10.5% bundles.